Project Description
Serving as the cost consultant on SmithGroup’s IDIQ contract for the A-E Design and Related Services, APR has been retained to provide independent cost estimates to support teams with Planning, FCA’s, Feasibility Studies, and Renovation Projects for the modernization of SSA’s nationwide facilities. To date, APR has been issued task orders at 24 SSA renovation/upgrade and construction projects, including:
- Annex Building Optimization Study, 2019 – 267,896 GSF, $51M.
- Annex Fitness Center Hot Water Infrastructure Replacement, 2020-21 – 356 GSF, $591,821
- Boiler Room Column Repair, 2018 – $29,197
- Child Care Center Walk-in Cooler, 2019-2020 – $188,600
- Child Care Center Partition Wall Order-of-Magnitude estimate, 2018 – $12,669
- Child Care Center Sidewalk Replacement, 2018 – $157,000
- Chicago Remote Operations Computing Center, 2019 – 1650 GSF, $985,000
- Distributed Antenna System:
- Arthur J. Altmeyer Building Modernization, 2020 – $1.03M
- Durham, NC Campus DAS, 2020 – $205,000
- Fredrick, MD NSC Building, 2020 – $293,000
- Woodlawn, MD Campus, 2020 – $6.76M
- National Computer Center 3rd Floor Distributed Software Engineering Lab and N.W. Quad Draft POR, 2018 – 558,596 GSF, $4.67M
- East High/Low Rise Buildings Optimization Study, 2019 – 178,814 GSF, $35.4M
- EB Antenna, Order of Magnitude, 2018 – $41,471
- Fire Alarm Amplifier Overheating Study Phase 1, 2019 – $534,000
- Fire Alarm Amplifier Overheating Study Phase 2, 2020 – $530,000
- Guard Booth Installation, 2018 – $709,992
- HQ Area of Refuge Communications, 2020 – $471,000
- National Computer Center Occupant/Load Feasibility Study, 2018 – $18.4M
- National Support Center Power Usage Effectiveness Study, 2020 – various recommendations, up to $4.23M
- OSEP Intelligence Community Directive 705 Compliance Study – Headquarters Control Space, 2020 – 1320 GSF, $412,000
- Perimeter East Building Interior Fit-Out
- 2nd Floor Optimized Swing Space, 2019-20 – 30,362 GSF, $1.45M
- 3rd Floor SIC/SOC Rooms Optimization, 2019-20 – 8323 GSF, $1.3M
- Stairwell Door Widening, 2019 – $679,000
- Penetration Fire Stopping Study, 2019 – 3971 GSF, $645,670
- Robert M. Ball Building Optimization Study, 2019 – 618,278 GSF + 2 stair towers, $195M
- Second Support Center Data Center Computational Dynamic Analysis, 2020 – $278,925
- Second Support Center Uptime Gap Analysis ROM Estimate Report, 2020 – $576,517
- Tenant Improvement Pricing Proposal, 2020 – 8014 GSF, $436,667